ELASTOPHENE FLAM 25 PDF

ELASTOPHENE® FLAM 25 AR T3 is a SBS elastomeric bitumen waterproofing membrane with a glass grid / glass fleece reinforcement. The topside is protected . ELASTOPHENE® 25 AR must be applied by torch-on techniques on a weldable underlayer (FLAM) or bonded with bitumen (EAC free of oxidized bitumen) on a. ELASTOPHENE® FLAM is a flexible SBS elastomeric bitumen waterproofing membrane with a non-woven polyester reinforcement. Both sides are.

Author: Yozshuktilar Grozilkree
Country: Tanzania
Language: English (Spanish)
Genre: Education
Published (Last): 28 June 2011
Pages: 57
PDF File Size: 19.41 Mb
ePub File Size: 20.51 Mb
ISBN: 278-2-67334-406-1
Downloads: 8407
Price: Free* [*Free Regsitration Required]
Uploader: Zulkilmaran

Click on figure to enlarge. Removal of remnants of previous waterproofing. These are ajusted now but will be fitted later taking into account the future height of the finished surface.

ELASTOPHENE® 25 – Soprema

Cliquer sur les photos pour les agrandir. Soudage du renfort sur platine et dalle.

Finishing around rain water collector See 2. Creative Commons Attribution – NoDerivs 3.

ELASTOPHENE® FLAM 70-25

On my roof, the rolls of the final layer are positioned north-south, so the second layer must be east-west. Finition autour de la platine.

The second bitumous layer is of the same material as the first. For example the first layer could be omitted, and the insulation glued directly to the existing surface. Cutting nord end 225 a roll of finishing layer. Click on photo to enlarge. L’isolation Knauf Thane ET.

The first layer, which provides the waterproofing, is of elastic bitumen, 2. Cinq points de Sopracolle par plaque. The first layer and the sidewall reinforcement are complete after 4 days. It prevents elasto;hene vapour reaching the insulation, and serves as a base for the finishing layer.

  AUDITORIA UN ENFOQUE INTEGRAL WHITTINGTON PDF

The photos on this page describe the work.

Il est bien plus rapide de remplacer les renforts par le flashing: Welding the outer reinforcement onto the collector. The third bitumous layer is a reinforced bitumen with its lower face covered by a film which melts when heated, elastophenee it to the second layer. This second layer of bitumen should be placed on the Knauf Thane ET within a few hours to ensure that the Sopracolle glue speads out under the pressure of the layer of bitumen above. Since the new waterproofing and the insulation will raise elasgophene roof, the rainwater drains must also be raised.

Chauffage du sur-renfort et de la platine. The Elastophene 25 is rolled out and cut to fit. Before the insulation is laid, the channels carrying the rain water are reinforced: Bitumous glue is applied to the rising side walls.

The work specified by this standard is often referred to as Three layers plus insulation, with heated reinforcement. Heating the outer-reinforcement and the collector. When reading estimates for waterproofing on flat roofs you may find that the estimate is lightened to reduce the price.

The two layers should be perpendicular to one another. Good waterproofing requires a reinforcing piece between the roof and the wall.

Click on the photos to enlarge them. Pas une goute n’entre dans la maison. The collector is trimmed before applying the outer reinforcement. Applying the insulation requires careful attention to the weather forecast and the planning of the work. Fitting the 2nd layer in front of the future rain collector. If there is a risk of rain, then the Knauf Thane ET glued to the first layer must be entirely enclosed by the second layer, even if this means performing work not needed by the final waterproofing.

  A2PS OUTPUT PDF

ELASTOPHENE® FLAM 25 – Soprema

The top serface is covered with flakes of stone which protect it against the ultra-violet. La partie bitume fait approximativement 2. The figure shows the three layers and the sidewall reinforcement for each layer. The orientation of the second layer depends on the way in which the third layer will be applied. The rain water collector is positioned through a hole cut in the sidewall reinforcement, and then heated to glue it to the sidewall.

Because there are few right angles, there are lots of triangles to elastphene filled in.

The joint of the flat roof and the rising walls that surround the roof are a possible source of leaks. The rain water collector will pass through this.

Fla, time has come to re-do the waterproofing on the terrace roof of my house. Last drops of the weekend’s heavy rain. Reinforcement at junction of standups.